Complete the form below
Please note that fields marked with an asterisk ( ) are mandatory.
0% completed
Total amount
New sewer connection
Information
To complete this application you will need details of your sewer connection, a debit/credit card to pay the application fee, and a drainage layout drawing.
If you leave this webpage for any reason after entering your contact details, then an email will be sent to you with a link to continue this application. This email will take an hour to arrive. If you need someone else to make payment for the application you can forward this email to them.
The application fee only covers the review of your application, and not the connection itself. That will be charged once we have your proposal has been reviewed.
If you have any issues or would like to speak to someone you can call us on 01225 52 6333 or email at [email protected]
Please indicate below the type and number of premises which you wish to connect, and whether that premise(s) is new or existing
Total amount
Site details
We need a few details regarding your project.
Development details
Total amount
Application details
We need just a few details of your project. Your progress will be saved and you can resume this application through the link that will be sent to your email.
Owner/Occupier details
Please provide the details of the homeowner that you are working on.
Total amount
New sewer connection
Type of ConnectionPlease provide details of your proposed connection(s).
Please note: Before Wessex Water will consider a surface water connection, you will need to demonstrate why the most preferable options from the SuDS hierarchy cannot be obtained.
Please note: Before Wessex Water will consider a surface water connection, you will need to demonstrate why the most preferable options from the SuDS hierarchy cannot be obtained.
Total amount
New sewer connection
You have stated that you plan to connect surface water to the public sewer network. Please confirm the area (in m²) that you propose to connect.
Connection Details
How is rainwater being dealt with at the premises?
If you propose to discharge non-household waste into our network, you will need to apply for separate approval for trade effluent consent. For advice on this, please go to www.wessexwater.co.uk/tradeeffluent.
Total amount
Contractor Details
We need just a few details of your project. Your progress will be saved and you can resume this application through the link that will be sent to your email.
Total amount
Upload relevant documents
File:
File Name | File Size(MB) | Status | Reason |
---|
Note:
- Drawings must show the relative position of Wessex Water assets to the building.
- For work relating to building over or near to a sewer, work must not start on site until formal approval has been granted by Wessex Water.
- Maximum file size is 50MB per file.
- Allowed file types are DOCX, DOC, PDF, XLS, XLSX, JPG, JPEG, BMP, PNG, DWG (auto cad), DXF (auto cad), DGN (microstation), PRP (microstation), PRW (microstation).
- If there are any files you are unable to upload, please email them separately to [email protected] and quote the site address and the name of the applicant.
Total amount